by 3amideas | Aug 30, 2022
Novo Gold Case Study 1 POWER SUPPLY AND DEWATERING UON > Projects > Case Studies BACKGROUND UON was contracted to supply “whole of mine” power and dewatering services for Nova Resources. This included managing a bore field that spanned over 100km with integrated...
by 3amideas | Aug 30, 2022
FMG Iron Ore Case Study 1 at6 MW POWER STATION 11kv UON > Projects > Case Studies BACKGROUND The FMG magnetite iron-ore mine was a new trial mine. UON was awarded the following works: 16 MW D&C Power Station for the OHP 2 MW D&C power supply for the CHF...
by 3amideas | Aug 29, 2022
Dacian Gold Case Study 1 at6 MW POWER STATION 11kv UON > Projects > Case Studies BACKGROUND UON were engaged to design, supply, install, test and commission a turnkey 6 MW / 11kV power station including remote monitoring, enabling development of a new...
by 3amideas | Aug 29, 2022
BELLEVUE GOLD CASE STUDY 1 VENT SHAFT DEWATERING UON > Projects > Case Studies BACKGROUND This historic mine was closed for over 20 years. The deepest part of the Bellevue mine reaches about 430 metres below the surface and stretch for 28 kilometres underground....
by 3amideas | Aug 29, 2022
ADAMAN GOLD CASE STUDY 1 PONTOON PUMPING STATION UON > Projects > Case Studies BACKGROUND The client required the ability to vary the flow of the water due to the complexities of disposal capacity. The variable speed ability of the generators granted the client...