Bore Installation & Removal

Bore Installation & Removal TRAILERS

UON has developed a mobile solution that installs and remove submersible bore pumps quicker and safer like no other.

Our patented Installation and Removal Systems are Australian designed for the harshest outback environment.

They are transportable and efficient that has proved to have reduced installation and removal time of submersible pumps through innovation and process control; as well as to eliminate the risk of any operator to work under a suspended load.

The IR System:
• Removes dangers of working under suspended load conditions
• Safely installs and removes submersible bore pumps
• Reduced risk to personnel injury through innovation and design
• Reduced installation time
• Reduced time of removing bore pumps
• Minimises manual handling increase productivity
• Approved and used by leading Western Australian mining companies

UON designs, fabricates and installs three forms of the IR System to give you innovative options to suit your operational requirements.

Truck Mounted IR5 System
Dimensions: 6.5m (l) x 2.5m (w) x 3.025m (h)
Dry Weight: 6.5 tonne

Trailer Mounted IR5 System
Dimensions: 6.5m (l) x 2.5m (w) x 3.025m (h)
Dry Weight: 7.5 tonne

Skid Mounted IR5 System
Dimensions: 6.5m (l) x 2.5m (w) x 3.025m (h)
Dry Weight: 7.5 tonne

UON have worked and consulted with major mining companies in order to develop the IR Systems that are designed to install and remove submersible pumps with major emphasis on increased safety and reduced installation time.

Download the UON WATER Solutions brochure

UON has the proven experience to create the water management solutions needed to manage operations efficiently and reliably. Dewatering pumping, potable water storage, tailings dams and HDPE pipelines and infrastructure are just part of the solutions that UON delivers.