UON were tasked with delivering a 30MW Power Station and electrical distribution power at 33kV. The Power Station was required to sustain operations during the relocation of a 132kV transmission line. The whole shutdown and operation was dependent on the successful energization of the power station on-time which was achieved. The project was designed and installed within the 12-week timeline.

Team Members

Pieces of equipment

Hours worked LTI-free

MW Installed

Pilbara

Region

BHP

Client

IRON ORE

Commodity

RENTAL

Contract

KEY SUCCESS

The key success of the Rapid-Deployment 30MW / 33kV Power Station was UON’s time management and orchestrated scheduling of people and plant. This allowed UON to deliver on time and without incident. UON’s close working relationship with the client on site allowed for a smooth deployment and synchronization of resources.

DELIVERABLES

    • 20 Modular Diesel Generators
    • 5 Modular 415V/33kV Substations
    • 33kV Switch Room
    • 440kL Fuel Storage
    • Unloading facility and Powerline Interconnection
    • All design, construction, commissioning, operation and decommissioning
    • Full design and construction delivered within the 12-week timeline

    OTHER PROJECTS

    Dacian Gold Case Study 1

    Dacian Gold Case Study 1

    The key success of the rapid-deployment 6 MW / 11 kV power station was the modularization and flexibility of all equipment provided as part of UON’s complete solution

    Bellevue Gold Case Study 1

    Bellevue Gold Case Study 1

    UON were tasked with delivering a dewatering solution for an old mine being reactivated, via an existing ventilation shaft.

    Adaman Gold Case Study 1

    Adaman Gold Case Study 1

    UON was contracted to design, manufacture and install a pontoon system to dewater over 7 Billion litres from an old open pit mine.

    BHP Case Study 2

    BHP Case Study 2

    UON were tasked to Supply, Manufacture and Install Major Dewatering Works and Transfer System.

    GET A PROMPT RESPONSE

    "*" indicates required fields