CASE STUDIES
Megawatts installed
%
Average fuel saved
GMC payback period
Click or hover over the dots on the map below to view our case studies.
BHP Iron Ore Case Study 1
UON minimised the loss of dewatering across these BHP sites during the removal of existing infrastructure and replacement with new infrastructure.
Bore pumps installed since 2010
Employees (30 April 2021)
Years Industry Experience
Novo Gold Case Study 1
Supply and Installation of Power Station for Underground Mining
FMG Iron Ore Case Study 1
The FMG magnetite iron-ore mine was a new trial mine.
Dacian Gold Case Study 1
The key success of the rapid-deployment 6 MW / 11 kV power station was the modularization and flexibility of all equipment provided as part of UON’s complete solution
Bellevue Gold Case Study 1
UON were tasked with delivering a dewatering solution for an old mine being reactivated, via an existing ventilation shaft.
Adaman Gold Case Study 1
UON was contracted to design, manufacture and install a pontoon system to dewater over 7 Billion litres from an old open pit mine.
BHP Case Study 3
The key success of the Rapid-Deployment 30MW Power Station was UON’s time management and orchestrated scheduling of people and plant.
BHP Case Study 2
UON were tasked to Supply, Manufacture and Install Major Dewatering Works and Transfer System.
Rio Case Study 1
During these projects UON achieved several key successes, with the number 1 success joining forces with the local traditional landowners.
Rio Case Study 2
UON successfully delivered and commissioned 7 in-pit dewatering packages, turkey’s nest, sedimentation basins, pumping station,
BHP Case Study 1
UON minimised the loss of dewatering across these BHP sites during the removal of existing infrastructure and replacement with new infrastructure.
GET A PROMPT RESPONSE
"*" indicates required fields